top of page
RAG photo.jpeg
Ricardo Grasselli

My Resume

RICARDO A. GRASSELLI

email: ricardo.grasselli@gmail.com | portfolio: rgrasselli.wixsite/grasselli | In: linkedin.com/in/ricardo-grasselli

 

HIGHLIGHTS OF QUALIFICATIONS

  • Strong interpersonal skills to work as a team member, passionate about learning and sharing knowledge.

  • Positive attitude and highly professional communication.

  • Organized, detail-oriented, and problem-solving skills.

  • Knowledge of BC Building Code 2018, Building Envelope Performance, Architectural Planning, Construction Drawings, and Contracts & Documents.

  • Revit, AutoCAD, Office Package, MS Project, and Bluebeam software.

  

CANADA WORK EXPERIENCE

ARCADIS / IBI Group Architects – Vancouver, BC 

Job Captain / Project Manager                                                                                                         May 2019 – Current  

  • Managing large and complex multi-family residential and mixed-use buildings from Conceptual Design, Construction Documents, and Construction Administration.

  • Coordination of team members to produce the set of drawings using Revit and Dynamo to run the statistics of the entire project - GFA, FSR, Site coverage, Unit Mix, and Parking.

  • Analyse building codes, by-laws, site requirements, and other technical documents and reports.

  • Coordination of the Structural, Mechanical, Electrical, Fire Protection, Code Report, Civil, and Landscape projects into the Architectural Revit model.

  • Leading meetings with clients, consultants, and contractors to ensure compliance with the design, project specifications, and regulations.

  • Contract Administration: answering RFIs and Shop Drawings.

 

IBI Milestone:

  1. Polygon - Talisman B: 4 concrete high-rise buildings with 328 residential units and CRUs (387,000 SF)

  2. Aquilini - Seymour Village Phase 6:  2 wood frame mid-rise buildings with 222 residential units (243,000 SF)

  3. BOSA - Kathleen: 1 concrete Tower with 324 rental units (216,000 SF)

  4. Marvel Group - Lions Gate: 3 concrete and 1 wood-frame building with a total of 326 units (330,000 SF)

  5. Crombie - Lynn Valley: 5 concrete mid-rise buildings and a Firehall Department on site. 

  6. Aquilini - Seymour Village Phase 7: 3 concrete Towers with a total of 868 units (700,000 SF)

  7. Downtown Kelowna Hotel – mixed-use high-rise-building project: Technical Support 

  8. Cascades Delta Casino – commercial high-rise building: Technical Support

  9. 825 Pacific St – commercial mid-rise building: Technical Support

BCIT – British Columbia Institute of Technology 

Teacher Assistant                                                                                                                              Sep 2021 – Current  

  • Building Envelope, Construction 1A, and Estimating 1

OMICRON AEC – Vancouver, BC 

Architectural Technologist                                                                                            Dec 2017 – April 2019 (part-time)

  • Schematic, Development Design, and Construction Documents in Revit & AutoCAD.

  • Development and Building Permit applications.

  • Massing and Feasibility studies of Industrial and Mixed-use buildings.

 

Omicron Milestone: Technical Support

  1. RIC - Richmond Industrial Centre – Master Plan Architectural drawings.

  2. SIM Production Way – Zoning by-laws, FSR and Massing studies.

  3. Greenshield Industrial – ALR & MOT applications, BP Arch. drawings.

  4. PacWest Industrial – ALR & MOT application, BP Arch. drawings.

  5. Home Depot Vancouver, Burnaby and Langley BP Renovation applications, IFT and IFC Architectural drawings.

  6. Evonik Lab – IFT & IFC Arch. drawings.

  7. Building 3 (RIC) – Office Layout

  8. N-RIC – Master Plan options to maximize FSR.

  9. Brick – Mezzanine Arch. drawings

  10. SGS Canada Inc – Floor plans renovation Arch. drawings.

  11. Telus – Massing and Feasibility studies of mixed-use buildings.

  12. Coquitlam Mixed-use project: 25-story Residential Tower, Commercial units on the Main Floor, and Townhouse above – Massing, Zoning Bylaw, and FSR studies.

  13. WRCA – Elementary School – IFT Arch. drawings

  14. Stratford – Elementary School – BP Arch. Drawings.

 

 

BRAZIL WORK EXPERIENCE

Ricardo Grasselli Architectural & Engineering – Sao Paulo, SP

Self-Employed                                                                                                        2000 – 2007 & May 2013 – June 2016

  • Architectural and Structural Design, Construction Drawings, and Coordination of the project.

  • Planned, organized, directed, controlled and evaluated +30 construction projects from beginning to completion according to the schedules, budget, milestones, and specifications.

  • Leading meetings with clients, consultants, and contractors to ensure compliance with the design, project specifications, and regulations.

 

 

CARBONE Construtora – Sao Paulo, SP

Project Coordinator - Civil Engineer                                                                                                Feb 2012 – April 2013

  • Planning and Coordinating Industrial projects from putting together the Bind documentation to technical supervision of the daily progress of construction.

  • Weekly meetings with the client, technical consultants, suppliers, and contractors, with the objective of coordinating the Architecture, Structure, Air Conditioning, Plumbing, and Electrical designs.

.

ENPLATEC Engenharia – Sao Paulo, SP

Project Manager – Civil Engineer                                                                                                     July 2007 – Jan 2012

  • Revision of the construction budget and cash flow of the contract.

  • Project Scheduling and Financial Planning, using MS Project – Gantt Chart.

  • Negotiating and Contracting trades and sub-trades according to the scope of work.

  • Responsible for the construction contracts of residential condos and commercial buildings, such as McDonald’s stores and Jesus Christ of Later-Day Saints church.  

 

BRASIL Milestone:

  1. CARBONE Eng: G6 - Industrial Building: 275,000 ft² (25,000 m²) – Project coordination

  2. SEMPRE Eng: Commercial Building: 75,000 ft² (7,000 m²) – Construction supervision.

  3. RG AEC: +30 Residential and Commercial Projects, including Architectural and Structural design, construction coordination of offices, mall stores, condos, and residential buildings.

  4. Math & Science Instructor: Teaching Mathematics and Science for Grades 6 to 12 at Isaac Newton School -  http://www.cosin.com.br/home.php.

​EDUCATION

BCIT – British Columbia Institute of Technology

  • ABT (Architectural & Building Technology)                                                                                               2017- 2019

 

Mackenzie University

  • Civil Engineer Bachelor’s Degree                                                                                                             1996 - 2000

                

 

INTERESTS – learning, travelling, outdoor activities, and hanging out with friends and family.

© 2017 by RAG Architectural & Engineering. Proudly created with Wix.com

bottom of page